Q. Excluding exceptions, what is the requirement for cabling work space, which includes a requirement for a clear work space not less than __________ wide where cables are located on both sides? In the case of cables installed on one side only, the minimum clear workspace shall not be less than 750 millimeters (2 feet 6 inches) wide. The vertical headroom shall not be less than __________, unless the opening is within 300 millimeters (1 foot), measured horizontally, of the adjacent interior wall of the enclosure.

A) 3 feet - 6 inches / 6 feet
B) the width of the equipment / 6 feet - 6 inches or the height of the equipment
C) 8 feet or the width of the equipment / 6 feet - 7 inches or the height of the equipment
D) 900 millimeters (3 feet) / 1.8 meters (6 feet)

Answer: D

Explanation: What is now Part V of Art. 110 of the 2005 NEC was relocated from Art. 314 during the 2005 Code cycle. To allow adequate space for qualified persons to examine, adjust, or maintain cabling within a manhole or other electric enclosure intended for personnel entry, the minimum requirements of Section 110.72 apply.

For safety’s sake, do not forget that for manholes — or other types of confined spaces — OSHA has rules for safety, which can be found in 1910.146(d). Also, do not forget to check Table 130.7(C)(9)(a) - Other Equipment 1 kV and Above of NFPA Standard 70E to determine the appropriate level of PPE required when examining cables in manholes or confined spaces.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at necexpert@aol.com.

Want to use this article? Click here for options!

what's wrong here?

What's Wrong Here?

May 7, 2009 2:38 PM

What's Wrong Here?

Apr 23, 2009 11:43 AM

What's Wrong Here?

Apr 9, 2009 2:18 PM

View all What's Wrong Here?

product of the week

Enclosures

February 8, 2010

Enclosures

View all 2010 Products of the Week



Professionals provide answers to your questions. Become an expert!



EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues